UNDP project encouraged environmentally friendly innovations
Baghdad open to talks, but referendum ‘complicates’ situation: Iraqi FM
We have to now be busy with the process of rebuilding Iraq
Memories of Anfal stir referendum ralliers in Garmiyan
“What Kurds suffered, no one has ever faced,”
Referendum will not be postponed: High Referendum Council
the referendum will take place on time
Deputy speaker convenes parliament for Saturday
KRG condemns Turkish airstrikes killing 7 people in Duhok province
It also called on Turkey to respect neighborly relations
US: If referendum proceeds, int’l support for Erbil-Baghdad talks ‘foreclosed’
“The United States urges Iraqi Kurdish leaders to accept
Gazprom’s Largest Ever Maritime Shipment – from Badra
Gazprom Neft Badra, operator of the Badra field, has undertaken the largest ever maritime shipment of oil for export in the company’s history, with 1.78 million barrels of hydrocarbons being despatched for the United States in the New Solution crude oil tanker.
This is, to date, the second oil consignment to the American market by Gazprom Neft Badra — recipients of the preceding 12 shipments having been European companies and refining facilities in the Asia—Pacific region.
Hydrocarbon exports from Iraq by Gazprom Neft are delivered by the State Oil Marketing Company (SOMO) and comprise the cost-recovery component of Gazprom Neft’s development of Badra field.
(Source: Gazprom Neft)
Range Energy gives Shewashan Operations Update
Range Energy Resources has announced that Gas Plus Khalakan (GPK), the sole contractor of the Khalakan PSC in the Kurdistan Region of Iraq, issued an operations update regarding the Shewashan field.
Shewashan #4:
The 4th well drilled on the Shewashan field, Shewashan #4, has been completed as a deviated producer in the Qamchuqa reservoir formation only to first extract remaining recoverable oil from this reservoir. There are future plans to recomplete on the Kometan and Shiranish reservoirs. The well was put on production at a rate of 500 bbl/d and is connected to the early production facilities.
The well completion utilized a hydrajet targeted acid stimulation through coiled tubing to enhance production from the fracture network. This is a technique that may now be applied to the other existing wells on the Shewashan field to further enhance productivity in the Qamchuqa and Kometan reservoirs. Water production is approximately 2500 bbl/d, an amount which is well within the design parameters of the new early production facilities.
Shewashan #1:
The Shewashan #1 well has been sidetracked and a new 4.5 inch liner installed. The well has now being recompleted on the Qamchuqa reservoir formation and is producing 750 bbls/day on a 24/64” choke and is currently water free. This well did not require a hydrajet targeted acid stimulation.
Shewashan #2:
The Shewashan #2 well which was previously producing 250 bbl/d from the Shiranish reservoir, is currently being sidetracked as the water isolation program conducted in Q2 2017 has resulted in reservoir damage that cannot be repaired. Production from the well is expected to be further enhanced with the stimulation techniques once a 4.5 inch liner has been installed.
Holding referendum now is ‘dangerous step’: Gorran, Komal
Gorran and Komal call for the vote to be postponed until time is right